Presentation: The Missing Load Details That Affect Grid-Edge Flexibility: A West Texas Case Study
The presentation examines a multi-phase data-center build-out in West Texas where public numbers shifted, closed-session code names were used, and local infrastructure constraints (water, land, emergency services) were only visible after FOIAs and agenda records were examined. These visibility gaps matter for load forecasting and grid-edge flexibility planning in ERCOT.