1. 19-Aug-2026
    Zilker Ballroom 2
  2. 19-Aug-2026
    Zilker Ballroom 2
  3. 18-Aug-2026
    Zilker Ballroom 3-4
  4. 18-Aug-2026
  5. 18-Aug-2026
    Zilker Ballroom 2
  6. 18-Aug-2026
    Zilker Ballroom 2
  7. 18-Aug-2026
    Zilker Ballroom 3-4

    The presentation examines a multi-phase data-center build-out in West Texas where public numbers shifted, closed-session code names were used, and local infrastructure constraints (water, land, emergency services) were only visible after FOIAs and agenda records were examined. These visibility gaps matter for load forecasting and grid-edge flexibility planning in ERCOT.

  8. 19-Aug-2026
  9. 19-Aug-2026
    Zilker Ballroom 3-4
  10. 19-Aug-2026
    Zilker Ballroom 2
  11. 19-Aug-2026
    Zilker Ballroom 3-4
  12. 20-Aug-2026
  13. 20-Aug-2026
    Zilker Ballroom 3-4
  14. 20-Aug-2026
    Zilker Ballroom 2
  15. 19-Aug-2026
    Zilker Ballroom 3-4

    Developing energy storage projects has never been more complex: interconnection queues are crowded, market rules evolve constantly, and the cost of a wrong siting or configuration decision can be enormous. This session delineates how the fundamental drivers of wholesale power markets, supply and demand dynamics, fuel prices, load growth, generation mix shifts, and policy signals combine to shape electricity prices, and walks though how platforms like CoMETS use research inputs and methodologies to build credible LMP forecasts. It will demystify how CoMETS can be used to transform labor intensive manual analysis into a fast, clear, data-driven workflow, including market data ingestion and dispatch modeling, revenue stack analysis, and risk scoring. Understand how project developers, investors, and asset managers can quickly move from uncertainty to conviction using advanced market analysis workflow.

  16. 18-Aug-2026
    Zilker Ballroom 3-4

    Texas is undergoing a fundamental shift in how it plans for and manages large load growth. While SB6 and ERCOT's new batch study process aimed at improving project evaluation, transmission planning, and readiness requirements, Gov. Abbott's moratorium on new data center approvals pending regulatory audit highlights the broader challenge of balancing growth with the needs of everyday Texans. This session will examine how ERCOT, regulators, developers, and large load customers are facing these realities, adapting to evolving requirements, and balancing reliability, risk, long-term planning, and the investment needed to meet Texas-sized load projections.

    • New announcements: What’s happening now, and where have policymakers and regulators landed? Any lessons yet from batch zero? Is SB 6 working as intended, and what new guidance or actions from ERCOT, the PUC, or the Legislature are still needed?
    • Operational realities: Can new generation realistically keep pace with projected growth? Get out your crystal ball: What resource mix is needed, and what happens if generation interconnection lags? What about reliability in August, the shoulder months?
    • How might grouped studies, capacity allocation, and transmission upgrades shape future development? Is a new batch every 6 months workable, and what projects get left behind? Could the makeup of batches impact upgrade assessments?
    • Is the transmission system ready? How might frequency variation or other issues impact grid operations? How are regional hubs affected, and what attributes dropped out?
    • More vs. better: What’s missing from the discussion in terms of ensuring that Texans aren’t harmed in the rush to interconnect and build? Where’s the balance for economic growth vs. reliability vs. affordability?
  17. 19-Aug-2026
    Zilker Ballroom 3-4

    With recent volatility declines, and as revenue certainty becomes increasingly critical to finance projects, the challenge for storage owners is no longer simply maximizing today’s revenues. The challenge has become building a financeable package of revenues that deliver consistent performance in a variety of market conditions. Operators are responding by pairing AI-powered optimization with sophisticated hedging and commercial strategies that reduce risk while preserving upside opportunities. This session will explore the tools, tradeoffs, and market dynamics shaping the next generation of merchant storage, and how leading market participants are adapting their merchant strategies to unlock higher asset value and compete in today’s evolving power markets.

    • Is pure merchant storage becoming harder to finance?
    • Which combinations of tolls, hedges, revenue floors, and derivatives are proving most effective in today’s markets?
    • What tradeoffs exist between maximizing revenue and improving revenue certainty?
    • What role does AI-driven optimization play once commercial structures are layered in?
    • How are lenders, investors, and asset owners evaluating merchant storage risk differently today than they were two years ago?
    • What strategies will position storage portfolios for long-term success as markets continue to evolve?
  18. 18-Aug-2026
    Zilker Ballroom 2
  19. 18-Aug-2026
    Zilker Ballroom 3-4

    The Texas clean energy market continues to operate amid significant political and regulatory uncertainty, as the OB3 cut key tax incentives and introduced new requirements, and past state legislative sessions included many measures perceived as anti-renewables. The 90th is shaping up to be just as difficult: Policymakers are expected to prioritize grid reliability and rising consumer prices by promoting dispatchable generation (i.e. gas plants) while costs, timelines, and equipment procurement make relying on new gas generation not a realistic option to meet load growth or lower power prices today. These dynamics influence investor sentiment, raising questions about how the industry can mitigate political risk. This session will bring together policy experts to discuss evolving political dynamics, priorities, and pathways to ensure Texas remains the top state for future clean energy development.

    • Texas is a pro-business state: How can the industry communicate the reality of load growth vs. generation timelines? What about political risks for investors: Are legislators aware of potential lost business and tax revenue? ERCOT vs MISO/SPP?
    • Federal/state/local/regional: Where do policies support each other and where are they misaligned? How can the industry combat misinformation on each level? SB 2627’s $5.4B Texas Energy Fund (TEF): What’s moving forward, and is it affecting outlooks?
    • Looking to the 90th: What state legislation is poised to make a big impact, where is the industry in lobbying state leaders, and can O&G become an ally?
    • Do well-capitalized developers need lobbying arms, or are state clean energy and storage organizations and associations capable of taking this on? Any volunteers?
    • Rubber meet road: TX needs every electron to meet new load and keep the economy flowing, so will it happen and can the grid support it? SB 6: Now that it has passed, what’s changed? Are updated load growth expectations translating into better policy?
    • Is there a ‘too much load growth’ tipping point? What did the new reliability standard change? What about Texas Backup Power Program’s (TBPP) $1.8B?   
  20. 19-Aug-2026
    Zilker Ballroom 3-4
  21. 18-Aug-2026
    Zilker Ballroom 3-4

    While record imports in 2025 gave developers supply to safe harbor a spate of projects, tariffs somewhat leveled, and domestic content (DC) charts and percentages are largely workable, the industry is barreling toward a new phase of supply chain complexity. Foreign Entity of Concern (FEOC) restrictions, uncertainty around guidance, compliance verification, and risk allocation are driving new diligence requirements and contractual considerations. Together tariffs, FEOC, DC, and TX’s LoneStar Protection Act from a Venn diagram reshaping procurement strategy, limiting supply, and adding new risks. This session will explore how stakeholders thread the needle on these rules, managing cost and risks, and structuring projects to remain viable.

    • Will FEOC raise costs and slow planning, and does waiting for final guidance risk losing the DC bonus? How do sponsors ensure procurement certainty, and what kinds of structuring might help? How important are relationships in this?
    • Hanging your hat on tariffs: Have tariffs stabilized, and what’s the added cost today? Is anyone looking for an IEEPA refund? Treasury engagement with stakeholders: Are the discussions constructive, and is final guidance aligning with stakeholder fact patterns?
    • The LoneStar Protection Act already prohibits electric grid equipment contracting with entities from China, Russia, Iran, and North Korea: How much more complexity does FEOC add for Texas projects? Do these two pieces of legislation align, or are there gaps?
    • Project level restrictions vs taxpayer level restrictions: What’s clear? Is FEOC guidance on labor and material sourcing complete enough to dispel uncertainty? Material assistance, continuous construction, PFE ambiguities: what challenges do these create?
    • Are FEOC compliant equipment suppliers charging more, and where will costs ultimately land? How many projects have become uneconomic due to FEOC, and are there remedies?
    • 3rd party verification: Are investors, credit buyers, or other parties looking to 3rd parties for valuation? What documentation do sponsors or EPCs need to provide? Who’s wearing recapture risk? How limited is US made supply given manufacturing gains?
  22. 18-Aug-2026
    Zilker Ballroom 3-4

    The launch of Real-Time Co-optimization Plus Batteries (RTC+B) in the ERCOT market marks a significant shift, enabling more dynamic dispatch of energy and ancillary services (AS) while introducing new block products to improve efficiency and reliability. Early results are being closely watched to assess impacts on pricing, ancillary service costs, and convergence between real-time and day-ahead markets. At the same time, evolving trading dynamics, liquidity considerations, and battery operational constraints, such as state-of-charge requirements, are creating both challenges and opportunities for market participants. This panel will explore initial outcomes of RTC+B and examine whether it is delivering on expectations while shaping the future of grid stability and market performance.

    • Is RTC+B creating cost reductions, lowering power and AS prices, or is it still too early to tell? Are expectations being met? Any certainty in its long-term impact for BOC assets?
    • Real-time and day-ahead markets: How interchangeable is dispatch to energy and AS service markets in practice? Is ERCOT having an easier time managing dispatch? What about transparency and more granular information? What uncertainties have emerged?
    • How are ERCOT power traders being impacted by the introduction of block products? Is better price convergence seen between the real-time and day-ahead markets?
    • How are liquidity and risk management practices being affected? Are new opportunities emerging? Is investment in dispatchable assets supported under the RTC+B?
    • What BESS operational impacts are seen with state of charge requirements? Are AS costs reduced? Are new models needed to capture relationships between energy, ancillary, and transmission congestion? Any impacts on future storage siting and revenue flows?
    • Firming intermittent resources: Are state-of-charge requirements, pricing, and tax incentives sending the right signals for financing new storage? Are ancillary economics better?
  23. 18-Aug-2026
    Zilker Ballroom 3-4

    Texas is facing rapid load growth and increasing transmission congestion and curtailment, making long-term transmission planning critical to maintaining resource adequacy and meeting load and generation interconnect. While Texas remains a leader in clean energy deployment, transmission bottlenecks complicate efforts to deliver power efficiently and cost-effectively. Stakeholders must balance the urgency of near-term expansion with comprehensive, forward-looking planning, raising complex questions around cost allocation, risk, and regulatory coordination. Evolving policies, technologies, and federal initiatives are also reshaping how transmission projects are evaluated, financed, and approved. This panel will examine the challenges and potential solutions to expand grid capacity, reduce congestion, and ensure the system can reliably meet future demand.

    • What’s the status of today’s transmission expansion plans and new projects? Are process and cost allocation changes affecting planning and project financing? 345 vs 765 KV?
    • How can transmission keep up with load growth? Are expedited approvals necessary? Without more inter-regional transmission ties, where’s the breaking point?
    • Are plans flexible enough to meet future system needs? Does ERCOT need to share stability data? Can West TX to load buildout happen, what about incentivizing new load in high congestion areas? What about GETs? Is CREZ 2 a pipedream? Any other avenues to explore?
    • 765 KV: What’s happening and what’s the timeline? What’s more cost-effective and quicker: new transmission vs GETs vs other upgrades? Who pays? What about 4CP revision?
    • How might FERC order 2023 and other federal initiatives change the landscape in TX? What risk reduction strategies are viable given the current conditions?
    • How is load balancing happening during planned maintenance? Where do stability limits really lie in a grid increasingly dominated by intermittent assets?
  24. 18-Aug-2026
    Zilker Ballroom 3-4

    Distributed energy resources (DERs), and virtual power plants (VPPs) are potential solutions to transmission constraints, rising retail energy costs, and broader grid challenges in Texas. However, integrating these resources into grid planning, pricing, and operations remains complex, requiring new market frameworks, aggregation pathways, and coordination between utilities, operators, and customers. Better communication across stakeholders is needed, while questions persist around incentives, rate design, and customer protections. DERs and VPPs improve flexibility, reduce peak demand, and support reliability, though their full impact on nodal pricing and system costs is still evolving. This panel will explore how distributed assets tap into the market, scale, and contribute to a more resilient and responsive energy system.

    • DERs and VPPs big picture: How will they impact the larger grid, the distribution system, nodal pricing, and transmission costs? What is needed to foster more widespread efforts?
    • Are any new bills anticipated in the 90th session to address DG and DER issues? What about expanding the ADER task force or the Texas Emergency Response Service program?
    • ADER Phase 3 and the Wholesale Market Subcommittee: What has emerged? How is the push to allow DSPs and LSEs to communicate with DERs and ADERs progressing?
    • Resi market: Is the solar installer contraction levelling out, and can state incentives or rate design help? Are bad actors adding to the problems, and what can regulators do to help?
    • Are incentives and penalties effectively rewarding load flexibility? How flexible are commercial and industrial facilities really? Is increased data visibility happening?

    Which communities are missing out or lack access to DERs/VPPs? Why, and how can we improve access? Updated retail and regulatory incentives? BTM load shifting?

  25. 19-Aug-2026
    Zilker Ballroom 3-4

    A wave of new legislation and ongoing ERCOT market redesign created significant uncertainty for clean energy development in 2025, with the 89th legislative session and OB3 dampening investment before conditions began to stabilize. As the 90th Texas Legislature approaches, further regulatory scrutiny of renewables and continued implementation of market reforms are expected, leaving stakeholders to navigate evolving rules, timelines, and cost allocation frameworks. Simultaneously, rising power prices and accelerating load growth are placing pressure on regulators and utilities to ensure resource adequacy and maintain affordability. With firm generation options facing practical constraints, clean energy, storage, and grid flexibility are increasingly critical to meeting near-term demand and stabilizing costs. This panel will explore how policy risk, market signals, and financing strategies intersect to support reliable, cost-effective clean energy deployment.

    • How do federal and state policy risk impact finance and development? On the state level, what do stakeholders anticipate for the 90th session in January?
    • Assumptions vs reality: How do today’s grid and pricing conditions affect the outlook for new assets? How accurate are the forecasts? How does Texas keep prices from ballooning for everyday customers? What about utility arrears? What has low volatility done?
    • Is solar penetration changing risk or price volatility, and are the new firming rules enough to mitigate this? What about Dispatchable Reliability Reserve Service (DRRS)?
    • Firming requirements, ancillary and other services pay scales: What’s clear, what’s opaque, and what can regulators do to make market participation better? How should cost containment really work? What about real time co-optimization?
    • Reserve Margin Mandate update: How tight can it get? What about the $10 billion “energy insurance program” – is that working as expected?
    • How do stakeholders address the mismatch between the cost and timelines of ‘preferred’ firm generation and those of renewables? Is the quick buildout timeline for solar and storage valued beyond the usual cost basis? How do LSEs view their role in maintaining RA?
  26. 19-Aug-2026
    Zilker Ballroom 3-4

    Clean energy financing in Texas is transitioning from an incentive-driven to a market-based framework, requiring developers, financiers, and investors to adapt. Many well-capitalized developers have enough safe harbored equipment and robust pipelines for the next 4 years, but eventually the industry must face the reality of an end to solar and wind tax incentives, juggling the haves and have-nots in their pipelines. Financiers and investors must incorporate market changes and new tax incentive compliance challenges into their assessments. This session will examine how financing strategies are evolving, where capital is flowing, and what risks and opportunities will define project development in 2026 and beyond.

    • What’s the current dealmaking activity, what are lenders looking to fund, and who’s funding at what stage? Is more debt feasible for everyone? Is accreditation problematic? What about private credit market, is this distress affecting renewables finance?
    • Has FEOC, interest rates, tariffs, or other factors changed valuation? Where are the risks, and what makes a project financeable today? Will the answer be different in 5 years?
    • What are the biggest drivers for deals in Texas, and how do they compare in ERCOT, SPP, and MISO? What do the forward curves say? Are LMP and basis risk being evaluated effectively? Are lenders and investors concerned about portfolio concentration in ERCOT?
    • How are financiers crystal-balling new renewables compared to other assets? What happens when projects in origination today actively need financing? Is storage the big winner here?
    • The current tax incentive market: What do today’s deals look like and how are TE investors assessing returns? How much of the market is going towards storage? Is uncertainty causing transferability bridge loan (TRABL) lenders to pull back from non-safe harbored deals?
    • Is taking longer to get to NTP changing when a project is de-risked from a lender perspective? What’s with futures, zero and negative offer curves?
  27. 19-Aug-2026
    Zilker Ballroom 2
  28. 19-Aug-2026
    Zilker Ballroom 3-4

    Clean energy development in Texas outpaced expectations despite recent uncertainty, with strong demand driven by data centers and C&I customers. However, developers face a complex and evolving landscape, new legislation, shifting ERCOT rules, capital market constraints, FEOC guidance, interconnection changes, ongoing transmission limitations, and rising costs, all further shaping which projects remain viable. While pivoting from an incentive to a market-driven model, developers, financiers, and other stakeholders must switch their thinking to focus on fundamentals and create sustainable growth, adapting strategies for financing, procurement, compliance, and risk mitigation. This panel will examine how developers are responding to these challenges and what the future holds for utility-scale renewable energy in Texas.

    • What does development look like today, in the next few years? How timelines, cost, and siting uncertainties evaluated? What about post-incentive projects, anyone crystal-balling those? Cost uncertainty and capital availability? Is co-location with load the answer?
    • FEOC, material assistance, begun construction, facts-and-circumstance, continuous physical work: Is guidance working? Are developers prioritizing projects and equipment shuffling? How are risks and costs shared: contract triggers, insurance?
    • How are transmission constraints and interconnection cost allocations changing? Are firming requirements shifting costs? Planning for congestion constraints? What new in ancillaries?
    • Money talks: What do PPAs look like today, and are data centers changing offtake expectations? How might developers work with utilities and large load customers to share appropriate risks? What about RECs, tax credits, the capital stack changing?
    • Is NIMBYism killing projects? Is development harder today given federal actions? What about distressed assets and M&A, are deep pockets necessary to move ahead?
    • Planning the future: How are developers looking at their finite safe harbored equipment and making decisions regarding where it goes? Are non-qualifying projects going to be financed, planned, or equipped differently, and what does the industry look like in the future?
  29. 19-Aug-2026
    Zilker Ballroom 3-4

    Energy storage has rapidly become a cornerstone of Texas’s power market, from peak shaving and ancillary services to grid stability, while creating new and increasingly complex revenue streams. As battery costs decline and load growth rises, Texas is positioned for significant BESS deployment, though developers must navigate evolving ERCOT and PUCT rules and ongoing uncertainty around ancillary service pricing and market design. Financing structures are also evolving: With merchant shrinking, PPAs, tolling agreements, and hybrid contracts are shaping bankability, alongside OB3’s good news. At the same time, FEOC compliance considerations add complexity to project execution. This panel will explore how storage is financed, built, and operated today, what revenue streams are proving durable, and how market, policy, and technology trends will shape the future of storage in Texas.

    • Who’s seeing what contracts: PPAs, ESCAs, tiered-revenue sharing, tolling agreements? New financing techniques? What about reserve margin participation? Will data center needs change the market vis-a-vis contracts? What’s happening with merchant getting contracted?
    • FEOC, tariffs, and equipment procurement: OB3 was (relatively) kind to storage, but how do developers and EPCs demonstrate compliance? Is final guidance clear and workable?
    • RTC+B: How’s that working in practice? Is BESS value captured? What’s the difference in financing/revenue projections for 4-hour BESS vs. 2-hour? Is non-Li Ion storage financeable? How can batteries be operationalized efficiently to make the most revenue?
    • Where is BESS being sited today, and what proportions of projects are FTM vs BTM? Is this likely to change given data center BTM usage projections? What about clarity on cost allocation for transmission vs distribution connected batteries? Is low volatility a killer?
    • Expectations vs reality: How much storage does TX need? Given the current queue, is this realistic? How does today’s landscape affect forward curves and future storage project bankability? Why are munis not buying storage? What’s real for BOS assets?
    • Mitigating risks: With fire, siting, permitting, NIMBYism, changing revenues, how can developers future-proof projects? Are strategies shifting to provide services and energy?
  30. 20-Aug-2026
  31. 19-Aug-2026
    Zilker Ballroom 3-4

    While permitting and interconnection have historically been low obstacles in Texas, a major shift is underway in ERCOT’s interconnection framework, as the Standard Generation Interconnection Agreement (SGIA) and PUCT Rule §25.195 introduce a new cost-sharing model that places greater interconnection financial responsibility on generators starting in 2026. Timing, siting decisions, and capital planning are now critical to maintaining project viability, as new FEOC construction deadlines, rising local opposition, and the approaching 90th session increase pressure on developers to move quickly while adapting to evolving requirements. This panel will explore how these changes impact project strategy, financing, and timelines in Texas.

    • What new strategies are emerging to optimize siting and interconnection in Texas today? Are they different in ERCOT vs non-ERCOT areas? Could SB 819 make a comeback?
    • SGIA: How high are the new costs? What about transparency and reporting requirements: are they reshaping how developers assess interconnection costs and risks?
    • FEOC vs siting vs interconnection: Could these rules change which projects are safe harbored, and how are developers assessing new regulations, costs, and local obstacles?
    • PUCT updated Rule §25.195: What is this changing and how do Transmission Service Providers (TSPs) recover the costs in 2026? Is the cap workable?
    • What can ERCOT learn from MISO or other regions? Are increased milestone payments, automatic withdrawal penalties, MISO’s surplus interconnection and generation replacement project, or other new policies on the table?
    • Local opposition: Is misinformation or NIMBYism in the rise, and how much time should developers take on communicating with local leaders? What’s fallen out of the queue due to all of the above?
  32. 20-Aug-2026
    Zilker Ballroom 3-4
    Distributed generation (DG), like residential, community, multi-family, and small C&I projects, are growing in TX, driven by customers seeking reliability during extreme weather. At the same time, the …
  33. 20-Aug-2026
    Zilker Ballroom 3-4

    Corporates, utilities, and AI/data centers are all seeking PPAs and other offtake agreements in a changing power price and exceptional load growth environment. There’s the electrons, RECs, tax incentives, timelines, and differing offtaker savviness to consider for each deal. The expansion of new players into offtake and credit transfer markets push creative financial engineering, contract models, and negotiations to new territories. Simultaneously, utilities are dealmaking while facing rising electricity rates, growing load, and intensifying public scrutiny while data centers and AI are seeking more, faster, firmer. This session tackles cutting-edge financing structure approaches, the new provisions, and negotiation strategies that have emerged.

    • What’s the size of the offtake market today, who’s looking for projects in Texas, and where are prices landing? On Site/Co-location vs PPAs/VPPAs vs RECs: What are customers looking for? Are new innovative structures emerging, and who’s taking what risk?
    • Macroeconomic forces: How are the economy, the OB3, tariffs, and other factors affecting how corporates, AI and other data centers, and other buyer appetites and priorities?
    • How do utilities see procurement today, and what’s different for large utilities and smaller municipals, tribal utilities, and co-ops? Where does community solar fit in?
    • Portfolio level financing and cross-collateralization: Is more diversified risk leading to larger loans? What about offtaker creditworthiness? Do new entrants need more insurance?
    • How is reliability vs decarbonization vs quality of power vs interconnection costs weighed by offtakers? Are these needs woven into agreements? Who’s shouldering utility infrastructure costs, and what happens when a planned facility doesn’t get built?
    • Data center impact: How much do they affect the future outlook of solar, storage, and other asset types? What about the $92B AI Energy Powerhouse Investments pledge?
  34. 20-Aug-2026
    Zilker Ballroom 3-4

    The presentation would focus on the infrastructure required to make smaller-scale clean energy projects work in practice—not just the technology itself. I would address the intersection of affordable financing, contractor capacity, legal and compliance requirements, servicing, customer protection, organizational capacity, and accountability. The central question would be: What must lenders, program administrators, contractors, and other stakeholders build so that residential, community, nonprofit, and small commercial clean energy projects can scale successfully?

  35. 20-Aug-2026
    Zilker Ballroom 3-4

    Hydrogen, CCUS, geothermal, RNG, alt fuels, SMRs: a bevy of technologies have become buzzwords, but what’s moving forward given the OB3, the Trump AI and Energy Initiative, and changes to NRC, LPO and DOE fund priorities? What is the market for each technology, who else is funding these projects, what investment approaches are moving forward, and what might the proliferation of these technologies do for the grid?

    • Bankability: What’s ready for deployment now, and what are the timelines, challenges, investment sizes, and capital needs? What about lessons learned from past projects?
    • Where are the best opportunities across asset types? Is nuclear poised to be the go-to firm non-carbon emitter given past cost and timeline overruns? What about geothermal?
    • 90th TX legislative session: What regulatory updates are needed to accommodate projects given the dire need for new generation? Are there specific hurdles to be overcome?
    • Tax incentives: Which assets attract TE, Pref Eq, and other investment? How do investors assess risk/return when taking on technology risk? Other federal funding sources?
    • Is hydrogen generation moving forward in TX given today’s realities, and what about derivatives like ammonia? What are the market sizes and investment realities?
    • What do utilities need to do to prepare? What’s dead: Are offshore wind, EV infrastructure, or other technologies facing headwinds workable today? What’s alive and kicking?